Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Select Language
1. Preparation and precautions before starting
a. Thoroughly check the mechanical seal, and whether the attachments and pipelines are installed properly and meet the technical requirements.
b. Perform static pressure test before starting the mechanical seal to check whether the mechanical seal has leakage. If there are more leaks, you should find out the reasons and try to eliminate them. If it is still invalid, it should be disassembled and reinstalled. Generally, the static pressure test pressure is 2~3 kg/cm2.
c. Press the pump to turn the disc to check if it is light and even. If the car is struggling or not moving, check whether the assembly size is wrong and the installation is reasonable.
2, installation and outage
a. Keep the sealed chamber filled with liquid before starting. For transporting a solidified medium, steam is applied to heat the sealed chamber to melt the medium. The car must be driven before starting to prevent the soft ring from breaking due to sudden start.
b. For the mechanical seal using the pump external sealing system, the oil sealing system should be activated first. Finally stop the oil sealing system after parking.
c. After the hot oil pump is stopped, the cooling water of the sealing oil chamber and the end face seal cannot be stopped immediately. When the oil temperature of the end seal is lowered to below 80 degrees, the cooling water can be stopped to avoid damage to the sealing parts.
3, running
a. If there is a slight leakage after the pump starts, it should be observed for a while. If the leakage is still not reduced if the operation is continued for 4 hours, the pump should be stopped.
b. The operating pressure of the pump should be stable and the pressure fluctuation should be no more than 1 kg/cm 2 .
c. During the operation of the pump, evacuation should be avoided to avoid dry friction and seal damage on the sealing surface.
d. Sealing should be checked frequently. During operation, when the leakage exceeds the standard, the heavy oil is not more than 5 drops/min, and the light oil is not more than 10/min. If there is no improvement trend within 2-3 days, the pump should be stopped to check the sealing device.
August 10, 2024
December 30, 2022
December 16, 2023
December 16, 2023
Envoyer à ce fournisseur
August 10, 2024
December 30, 2022
December 16, 2023
December 16, 2023
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.
Fill in more information so that we can get in touch with you faster
Privacy statement: Your privacy is very important to Us. Our company promises not to disclose your personal information to any external company with out your explicit permission.